Completed Projects
Browse through some of our completed projects.
P1245 Spectral Induced Polarization (SIP)
Read more: P1245 Spectral Induced Polarization (SIP)This project will explore ways to promote wide-spread industry use of SIP, by devising and testing solutions to factors currently limiting its utility and application”. Solutions to those limitations will be devised and tested.
Tim Cross
Program Manager
In Management; Closed for Sponsorship
P1196A Integration of ColdBlock Digestion Technology into an Automation System
Read more: P1196A Integration of ColdBlock Digestion Technology into an Automation SystemThere is a drive to speed up the turn-around time for sample analysis. The high number of samples submitted for analysis from exploration or everyday operations result in sample processing backlogs and delays in reporting. These delays can have a crucial impact on decision making whether it is operational decisions or exploration and project decisions.
Anil Subramanya
GM Africa/VP Geosciences
Completed; Closed
P1187A Deeper, smaller and faster GPR – Multispectral GPR: Stage 2
Read more: P1187A Deeper, smaller and faster GPR – Multispectral GPR: Stage 2Amira’s Project P1187 developed a 30 cm long magnetic radar receiver that significantly outperformed traditional electrical field dipoles which are 20 times their length. The magnetic sensors are designed for low frequency (< 40 MHz applications) for deep penetration in challenging radar environments. In a trial at a mineral deposit in Western Australia overlain by…
Silvia Black
Program Manager
In Management; Open to sponsors
P1150A Large throughput iron ore oscillatory dewatering system
Read more: P1150A Large throughput iron ore oscillatory dewatering systemMoisture control is critical for safe and economic iron ore production and export. Moisture must be high enough to suppress dust, yet below the level where material handling difficulties occur and below the transportable moisture limit (TML) for safe shipping. There are substantial economic benefits to minimising iron ore moisture, e.g. a 1% reduction in…
Program Manager
P705D Cost, productivity and occupational health improvement for base metal
Read more: P705D Cost, productivity and occupational health improvement for base metalInnovation in base metals electrowinning can lead to increased throughput in tankhouses, reduced operating costs and better product quality. This project is aimed at helping the industry to achieve these outcomes. The work program focuses on improving the performance of anodes of both current and new compositions, and the quality of cathodes produced.
Brad Atkinson
Program Manager
Completed
P1210 Optimal Pushback Design
Read more: P1210 Optimal Pushback DesignThe aim of this project is to develop software that optimises designs for the operational constraints of connectivity, minimum bench width and appropriate angles between pushbacks.
Program Manager
Completed; Closed